Work Reports
R2.9(B): CSSR details Report
Report Generated as on 16-May-2022
Sno Work Type Name Task Code Task Name Unit of Measurement Rate
1 Check Dam 32021 Excavation in all kinds of soils including boulder upto 0.30 mt diameter for field channels ,seating of embankment for field channels etc., including dressing of bed and sides to required level and profile ,cost of all materials ,machinery ,labour,placing the excavated earth for formation of service rorad/embankment as directed etc., complete with intial lead upto 10 mt and lift upto 3.0 mt ((For foundation of checkdam) Cu.m 55.35
2 32022 Excavation in all kinds of soils including boulder upto 0.30 mt diameter for field channels ,seating of embankment for field channels etc., including dressing of bed and sides to required level and profile ,cost of all materials ,machinery ,labour,placing the excavated earth for formation of service rorad/embankment as directed etc., complete with intial lead upto 10 mt and lift upto 3.0 mt ((For Bund Formation) Cu.m 55.35
3 32023 Laying of cement concrete(1:5:10) using 40mm HBG/OTG machine crushed metal including cost of all materials and labour charges with machine mixing,but excluding conveyance of all materials etc,complete for foundation of checkdam Cu.m 3671.92
4 32024 Laying of plain cement concrete (1:3:6) using 60% of 40mm HBG machine crushed metal and 40% of 20mm HBG machine crushed metal including cost of all materials and centering charges,vibrating charges and labour charges but excluding of conveyance of all materials etc,complete for checkdam Cu.m 4403.28
5 32025 Laying of plain cement concrete (1:2.5:5) using 20mm HBG machine crushed metal including cost of all materials with machine mixing,compaction and labour charges, but excluding conveyance of all materials etc.,complete for wearin coat Cu.m 4511.98
6 32026 Rough stone dry packing using 225mm rough stones of OTG/HBG variety for talus including cost of all materials,including splitting and filling of spalls labour charges,but excluding conveyance of all materials etc ..complete Cu.m 841.50
7 32027 Cost of Rough stone dry packing using 225 mm rough stone of OTG variety including cost of all materials and labour charges and curing but excluding conveyance of all materials Cu.m 841.50
8 32028 Conveyance charges for sand Cu.m 0
9 32029 Conveyance charges for 40 mm metal of HBG Cu.m 0
10 32030 Conveyance charges for 20 mm metal of HBG Cu.m 0
11 32031 Conveyance Charges For 225mm Rough stone Cu.m 0
12 32032 Name board and other contingencies Nos 1000
13 Farm Pond 31766 Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 0.5km Kms 0
14 31767 Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 1km Kms 0
15 31768 Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 2kms Kms 0
16 31769 Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 3kms Kms 0
17 31770 Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 4kms Kms 0
18 31771 Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 5kms Kms 73.77
19 32122 Grass Planting/sowing/sodding(LS) LS 2000
20 32125 Black Cotton Soil Cu.m 0
21 32127 225mm Rough stone dry packing charges including Collection of Stones (Silt Trap Up stream and Down Stream) Cu.m 841.50
22 32128 Name Board Nos 700
23 Mini Percolation Tank 30803 Conveyance charges for 225 mm rough stone including loading and unloading Cu.m 0
24 30898 Name board and other contingencies No.s 2000
25 31556 225mm Rough stone dry packing charges including cost of material Cu.m 841.50
26 7341 Charges for rolling in layers by 2T Roller/cattle treading including watering and necessary leveling and sectioning Cu.m 21.45
27 Percolation Tank 30726 Earth work excavation and depositing on bank in all kinds of soils including boulders of bed and sides to required level,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10m and lift upto 3m for strripping Cu.m 55.35
28 30727 Earth work excavation and depositing on bank in all kinds of soils including boulders of bed and sides to required level,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10m and lift upto 3m for key trench Cu.m 55.35
29 30728 Earth work excavation and depositing on bank in BC soils,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10 m and lift upto 3m for key trench cu.m 55.35
30 30729 Conveyance charges for black cotton soil from source to site for key trench filling Cu.m 0
31 30730 Filling the BC soils in key trench including compaction and spreading of BC soil in layers @ OMC including conveyance of water using 2T static road roller as per (CSSR) Cu.m 21.45
32 30731 Earth work excavation and depositing on bank in all kinds of soils including dressing of bed and sides to required level and profile,cost of all materials,machinary,labour,placing the excavated earth for formation of embankment as directed etc,complete with an initial lead upto 10m and lift upto 3m for bundformation Cu.m 107.31
33 30733 Earth work for bund formation in all kinds of soils including compaction and spreading all kinds of soils in layers upto OMC including conveyance of water using 2T static road roller as per (CSSR) Cu.m 21.45
34 30734 Earth work excavation and depositing on bank in all kinds of soils including boulders and sides to required level and profile,cost of all materials,machinary,labour,placing the excavated earth for formation of embankment as directed etc,complete with an initial lead upto 10m and lift upto 3m for toewall cu.m 55.35
35 30735 Rehandiling charges for formation of bund with available soils obtained from stripping and toe wall Cu.m 27.68
36 30736 Rough stone dry packing using 225mm roughstone of OTG/HBG variety for revetment,toe wall,talus of weir including cost of all materials,including splitting,filling of spalls and labour charges,but excluding conveyance of all materials etc ..complete Cu.m 841.50
37 30737 Laying of plain cement concrete (1:5:10) using 40mm HBG machine crushed metal including cost of all materials and labour charges with machine mixingand compaction, but excluding conveyance of all materials etc,complete for foundation of weir Cu.m 3671.32
38 30738 Laying of plain cement concrete (1:3:6) using 60% of 40mm HBG machine crushed metall and 40% of 20mm HBG Machine crushed metal including cost of all materials and centering charges,vibrating charges and labour charges But excluding of conveyance of all materials etc,,complete for weir Cu.m 4403.28
39 30739 Laying of plain cement concrete (1:2.5:5) using 20mm HBG machine crushed metal lincluding cost of all materials with machine mixing,compaction and labour charges,but excluding conveyance of all materials etc,complete for wearin coat Cu.m 4511.98
40 30740 Conveyance charges for sand including loading and unloading Cu.m 0
41 30741 Conveyance charges for 40 mm HBG machine crushed metal including loading and unloading Cu.m 0
42 30742 Conveyance charges for 20 mm HBG machine crushed metal including loading and unloading Cu.m 0
43 30743 Conveyance charges for 225 mm rough stone including loading and unloading Cu.m 0
44 30879 Conveyance charges for excavated earth from source to site for formation of bund Cu.m 0
45 30898 Name board and other contingencies Nos. 700
46 30900 Conveyance of excavated earth for keytrench in manual mode cu.m 0
47 30901 Charges for rolling in layers by 10T roller for consolidation of bund formation Cu.m 27.50
48 30902 Earth work excavation with machine for bund formation 50% insitu Cu.m 107.31
49 30903 Earth work excavation with machine for bund formation 50% conveyance Cu.m 55.35
50 30990 Clearing of Light/medium/Juliflora including Up-rooting and removing of stumps Sqm 6.06
51 Repairs to Existing Check Dam 13327 Cost of CC 1:4:8 Mix Concrete using 40mm OTG metal for cut off trench, solid apron etc. Cu.m 2771.52
52 13328 Cost of CC(1:3:6) mix using 66% 40 mm HBG/OTG metal and 34% of 20mm HBG metal for body wall, guide wall, etc. Cu.m 4403.28
53 13329 Cost of CC 1:3:6 mix using 66% 40 mm OTG metal and 34% of 20mm OTG metal for body wall, guide wall, etc. Cu.m 4403.28
54 13333 Cost of CC 1:2:4 mix using 20mm OTG metal for solid apron, coping on body wall, etc. Cu.m 3961.92
55 13334 Cost of Granite Rough Stone Dry Packing for loose apron. Cu.m 841.50
56 13335 Cost of Granite Rough Stone Dry Packing for rivetment. Cu.m 841.50
57 13345 Conveyance charges of sand including loading and unloading Cu.m 0
58 13346 Conveyance charges of 40mm metal of HBG/OTG variety including loading and unloading Cu.m 0
59 13347 Conveyance charges of 40mm metal of OTG variety including loading and unloading Cu.m 0
60 13348 Conveyance charges of 20 mm metal of HBG/OTG variety including loading and unloading Cu.m 0
61 13349 Conveyance charges of 20 mm metal of OTG variety including loading and unloading Cu.m 0
62 13350 Conveyance charges of RR stone of HBG/OTG Variety including loading and unloading Cu.m 0
63 13351 Conveyance charges of RR stone of OTG Variety including loading and unloading Cu.m 0
64 13352 Conveyance charges of 225 mm rough stone of HBG/OTG variety including loading and unloading Cu.m 0
65 13353 Conveyance charges of 225 mm rough stone of OTG variety including loading and unloading Cu.m 0
66 13354 Cost of RR Masonry in OTG stone in cement mortar 1:5 for body wall, guide wall Cu.m 2872.72
67 13355 Cost of OTG Rough Stone Dry Packing for loose apron. Cu.m 841.50
68 13356 Cost of OTG Rough Stone Dry Packing for rivetment. Cu.m 841.50
69 13357 Cost of Granite Rough Stone Dry Packing for toewall. Cu.m 841.50
70 13358 Cost of OTG Rough Stone Dry Packing for toewall. Cu.m 841.50
71 16652 Cost of CC(1:2.5:5) using 20mm HBG machine crushed metal including cost of all materials and labour charges and curing but excluding conveyance of all materials Cu.m 4511.98
72 30798 Laying of cement concrete(1:5:10) using 40mm HBG/OTG machine crushed metal including cost of all materials and labour charges with machine mixing,but excluding conveyance of all materials etc,complete for foundation of checkdam Cu.m 3671.32
73 30864 Name board and other contingencies Nos. 500
74 30996 Cost of 225 mm thick rough stone for revetment/Apron/Toe Wall Cu.m 841.50
75 31010 Cost of RR masonry in cement mortar 1:6 using new stones of hard variety including cost of all materials for body wall, guide wall,etc. Cu.m 2872.72
76 31011 Cost of Plastering with cement mortar 1:5 mix 12mm thick including cost of all materials for body wall, guide walls, etc. Sqm 255.08
77 Repairs to Existing Mini Percolation Tank 0313 Conveyance charges for 225 mm rough stone including loading and unloading Trips 0
78 30825 Charges for rolling in layers by 2T roller/cattle treading including watering, necessary levelling and sectioning with keytrench Cu.m 21.45
79 30826 Charges for rolling in layers by 10T roller/cattle treading including watering, necessary levelling and sectioning with keytrench Cu.m 37.02
80 30864 Name board and other contingencies Nos. 500
81 30990 Clearing of Light/medium/Juliflora including Up-rooting and removing of stumps Sqm 6.06
82 30993 Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km Cu.m 107.31
83 30994 Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund with Lead Cu.m 55.35
84 30995 Conveyance charges for excavated earth from source to site for formation of Bund Cu.m 0
85 30996 Cost of 225 mm thick rough stone for revetment/Apron/Toe Wall Cu.m 841.50
86 30997 Earth work excavation with machine for stripping of loose soil Cu.m 55.35
87 31000 Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km Cu.m 107.31
88 31226 Cost of 225 mm thick rough stone for Apron/Toe Wall Cu.m 841.50
89 31227 Cost of 225 mm thick rough stone for Revetment Cu.m 841.50
90 31256 Rehandiling charges for formation of bund with available soils obtained from stripping,key trench and toe wall Cu.m 27.68
91 Repairs to Existing Percolation Tank 0313 Conveyance charges for 225 mm rough stone including loading and unloading Trips 0
92 0384 Conveyance Charges For Black Cotton Soil Cu.m 0
93 13345 Conveyance charges of sand including loading and unloading Cu.m 0
94 13346 Conveyance charges of 40mm metal of HBG/OTG variety including loading and unloading Cu.m 0
95 13348 Conveyance charges of 20 mm metal of HBG/OTG variety including loading and unloading Cu.m 0
96 13350 Conveyance charges of RR stone of HBG/OTG Variety including loading and unloading Cu.m 0
97 13359 Cost of 225 mm thick Rough Stone for toe wall for Stone type OTG Cu.m 841.50
98 30737 Laying of plain cement concrete (1:5:10) using 40mm HBG machine crushed metal including cost of all materials and labour charges with machine mixingand compaction, but excluding conveyance of all materials etc,complete for foundation of weir Cu.m 3671.32
99 30738 Laying of plain cement concrete (1:3:6) using 60% of 40mm HBG machine crushed metall and 40% of 20mm HBG Machine crushed metal including cost of all materials and centering charges,vibrating charges and labour charges But excluding of conveyance of all materials etc,,complete for weir Cu.m 4403.28
100 30739 Laying of plain cement concrete (1:2.5:5) using 20mm HBG machine crushed metal lincluding cost of all materials with machine mixing,compaction and labour charges,but excluding conveyance of all materials etc,complete for wearin coat Cu.m 4511.98
101 30825 Charges for rolling in layers by 2T roller/cattle treading including watering, necessary levelling and sectioning with keytrench Cu.m 21.45
102 30826 Charges for rolling in layers by 10T roller/cattle treading including watering, necessary levelling and sectioning with keytrench Cu.m 37.02
103 30864 Name board and other contingencies Nos. 500
104 30990 Clearing of Light/medium/Juliflora including Up-rooting and removing of stumps Sqm 6.06
105 30991 Earth work excavation in all kinds of soils & placing the excavted soil using machine to the work site for formation of embankment to the required shape including hire charges for machinery and all other charges with a lead beyond 10m and upto 50m and lift up to 3 m for cutoff trench Cu.m 66.50
106 30992 Earth work excavation and depositing on bank in all kinds of soils including boulders of bed and sides to required level,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10m and lift upto 3m BC soil for cutoff trench Cu.m 55.35
107 30993 Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km Cu.m 107.31
108 30994 Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund with Lead Cu.m 55.35
109 30995 Conveyance charges for excavated earth from source to site for formation of Bund Cu.m 0
110 30996 Cost of 225 mm thick rough stone for revetment/Apron/Toe Wall Cu.m 841.50
111 30997 Earth work excavation with machine for stripping of loose soil Cu.m 55.35
112 31000 Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km Cu.m 107.31
113 31001 Plastering with CM (1;5)mix,12 mm th including cost of all materials etc for 10 Sqm etc., complete Sqm 255.08
114 31002 RR Masonry in CM (1;6) using new stones of hard variety including cost of all materials etc for 1Cum complete Cum 2872.72