1
|
Check Dam
|
32021
|
Excavation in all kinds of soils including boulder upto 0.30 mt diameter for field channels ,seating of embankment for field channels etc., including dressing of bed and sides to required level and profile ,cost of all materials ,machinery ,labour,placing the excavated earth for formation of service rorad/embankment as directed etc., complete with intial lead upto 10 mt and lift upto 3.0 mt ((For foundation of checkdam)
|
Cu.m
|
55.35
|
2
|
32022
|
Excavation in all kinds of soils including boulder upto 0.30 mt diameter for field channels ,seating of embankment for field channels etc., including dressing of bed and sides to required level and profile ,cost of all materials ,machinery ,labour,placing the excavated earth for formation of service rorad/embankment as directed etc., complete with intial lead upto 10 mt and lift upto 3.0 mt ((For Bund Formation)
|
Cu.m
|
55.35
|
3
|
32023
|
Laying of cement concrete(1:5:10) using 40mm HBG/OTG machine crushed metal including cost of all materials and labour charges with machine mixing,but excluding conveyance of all materials etc,complete for foundation of checkdam
|
Cu.m
|
3671.92
|
4
|
32024
|
Laying of plain cement concrete (1:3:6) using 60% of 40mm HBG machine crushed metal and 40% of 20mm HBG machine crushed metal including cost of all materials and centering charges,vibrating charges and labour charges but excluding of conveyance of all materials etc,complete for checkdam
|
Cu.m
|
4403.28
|
5
|
32025
|
Laying of plain cement concrete (1:2.5:5) using 20mm HBG machine crushed metal including cost of all materials with machine mixing,compaction and labour charges, but excluding conveyance of all materials etc.,complete for wearin coat
|
Cu.m
|
4511.98
|
6
|
32026
|
Rough stone dry packing using 225mm rough stones of OTG/HBG variety for talus including cost of all materials,including splitting and filling of spalls labour charges,but excluding conveyance of all materials etc ..complete
|
Cu.m
|
841.50
|
7
|
32027
|
Cost of Rough stone dry packing using 225 mm rough stone of OTG variety including cost of all materials and labour charges and curing but excluding conveyance of all materials
|
Cu.m
|
841.50
|
8
|
32028
|
Conveyance charges for sand
|
Cu.m
|
0
|
9
|
32029
|
Conveyance charges for 40 mm metal of HBG
|
Cu.m
|
0
|
10
|
32030
|
Conveyance charges for 20 mm metal of HBG
|
Cu.m
|
0
|
11
|
32031
|
Conveyance Charges For 225mm Rough stone
|
Cu.m
|
0
|
12
|
32032
|
Name board and other contingencies
|
Nos
|
1000
|
13
|
Farm Pond
|
31766
|
Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 0.5km
|
Kms
|
0
|
14
|
31767
|
Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 1km
|
Kms
|
0
|
15
|
31768
|
Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 2kms
|
Kms
|
0
|
16
|
31769
|
Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 3kms
|
Kms
|
0
|
17
|
31770
|
Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 4kms
|
Kms
|
0
|
18
|
31771
|
Conveyance charges for 225 mm rough stone including loading and unloading upto a lead of 5kms
|
Kms
|
73.77
|
19
|
32122
|
Grass Planting/sowing/sodding(LS)
|
LS
|
2000
|
20
|
32125
|
Black Cotton Soil
|
Cu.m
|
0
|
21
|
32127
|
225mm Rough stone dry packing charges including Collection of Stones (Silt Trap Up stream and Down Stream)
|
Cu.m
|
841.50
|
22
|
32128
|
Name Board
|
Nos
|
700
|
23
|
Mini Percolation Tank
|
30803
|
Conveyance charges for 225 mm rough stone including loading and unloading
|
Cu.m
|
0
|
24
|
30898
|
Name board and other contingencies
|
No.s
|
2000
|
25
|
31556
|
225mm Rough stone dry packing charges including cost of material
|
Cu.m
|
841.50
|
26
|
7341
|
Charges for rolling in layers by 2T Roller/cattle treading including watering and necessary leveling and sectioning
|
Cu.m
|
21.45
|
27
|
Percolation Tank
|
30726
|
Earth work excavation and depositing on bank in all kinds of soils including boulders of bed and sides to required level,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10m and lift upto 3m for strripping
|
Cu.m
|
55.35
|
28
|
30727
|
Earth work excavation and depositing on bank in all kinds of soils including boulders of bed and sides to required level,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10m and lift upto 3m for key trench
|
Cu.m
|
55.35
|
29
|
30728
|
Earth work excavation and depositing on bank in BC soils,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10 m and lift upto 3m for key trench
|
cu.m
|
55.35
|
30
|
30729
|
Conveyance charges for black cotton soil from source to site for key trench filling
|
Cu.m
|
0
|
31
|
30730
|
Filling the BC soils in key trench including compaction and spreading of BC soil in layers @ OMC including conveyance of water using 2T static road roller as per (CSSR)
|
Cu.m
|
21.45
|
32
|
30731
|
Earth work excavation and depositing on bank in all kinds of soils including dressing of bed and sides to required level and profile,cost of all materials,machinary,labour,placing the excavated earth for formation of embankment as directed etc,complete with an initial lead upto 10m and lift upto 3m for bundformation
|
Cu.m
|
107.31
|
33
|
30733
|
Earth work for bund formation in all kinds of soils including compaction and spreading all kinds of soils in layers upto OMC including conveyance of water using 2T static road roller as per (CSSR)
|
Cu.m
|
21.45
|
34
|
30734
|
Earth work excavation and depositing on bank in all kinds of soils including boulders and sides to required level and profile,cost of all materials,machinary,labour,placing the excavated earth for formation of embankment as directed etc,complete with an initial lead upto 10m and lift upto 3m for toewall
|
cu.m
|
55.35
|
35
|
30735
|
Rehandiling charges for formation of bund with available soils obtained from stripping and toe wall
|
Cu.m
|
27.68
|
36
|
30736
|
Rough stone dry packing using 225mm roughstone of OTG/HBG variety for revetment,toe wall,talus of weir including cost of all materials,including splitting,filling of spalls and labour charges,but excluding conveyance of all materials etc ..complete
|
Cu.m
|
841.50
|
37
|
30737
|
Laying of plain cement concrete (1:5:10) using 40mm HBG machine crushed metal including cost of all materials and labour charges with machine mixingand compaction, but excluding conveyance of all materials etc,complete for foundation of weir
|
Cu.m
|
3671.32
|
38
|
30738
|
Laying of plain cement concrete (1:3:6) using 60% of 40mm HBG machine crushed metall and 40% of 20mm HBG Machine crushed metal including cost of all materials and centering charges,vibrating charges and labour charges But excluding of conveyance of all materials etc,,complete for weir
|
Cu.m
|
4403.28
|
39
|
30739
|
Laying of plain cement concrete (1:2.5:5) using 20mm HBG machine crushed metal lincluding cost of all materials with machine mixing,compaction and labour charges,but excluding conveyance of all materials etc,complete for wearin coat
|
Cu.m
|
4511.98
|
40
|
30740
|
Conveyance charges for sand including loading and unloading
|
Cu.m
|
0
|
41
|
30741
|
Conveyance charges for 40 mm HBG machine crushed metal including loading and unloading
|
Cu.m
|
0
|
42
|
30742
|
Conveyance charges for 20 mm HBG machine crushed metal including loading and unloading
|
Cu.m
|
0
|
43
|
30743
|
Conveyance charges for 225 mm rough stone including loading and unloading
|
Cu.m
|
0
|
44
|
30879
|
Conveyance charges for excavated earth from source to site for formation of bund
|
Cu.m
|
0
|
45
|
30898
|
Name board and other contingencies
|
Nos.
|
700
|
46
|
30900
|
Conveyance of excavated earth for keytrench in manual mode
|
cu.m
|
0
|
47
|
30901
|
Charges for rolling in layers by 10T roller for consolidation of bund formation
|
Cu.m
|
27.50
|
48
|
30902
|
Earth work excavation with machine for bund formation 50% insitu
|
Cu.m
|
107.31
|
49
|
30903
|
Earth work excavation with machine for bund formation 50% conveyance
|
Cu.m
|
55.35
|
50
|
30990
|
Clearing of Light/medium/Juliflora including Up-rooting and removing of stumps
|
Sqm
|
6.06
|
51
|
Repairs to Existing Check Dam
|
13327
|
Cost of CC 1:4:8 Mix Concrete using 40mm OTG metal for cut off trench, solid apron etc.
|
Cu.m
|
2771.52
|
52
|
13328
|
Cost of CC(1:3:6) mix using 66% 40 mm HBG/OTG metal and 34% of 20mm HBG metal for body wall, guide wall, etc.
|
Cu.m
|
4403.28
|
53
|
13329
|
Cost of CC 1:3:6 mix using 66% 40 mm OTG metal and 34% of 20mm OTG metal for body wall, guide wall, etc.
|
Cu.m
|
4403.28
|
54
|
13333
|
Cost of CC 1:2:4 mix using 20mm OTG metal for solid apron, coping on body wall, etc.
|
Cu.m
|
3961.92
|
55
|
13334
|
Cost of Granite Rough Stone Dry Packing for loose apron.
|
Cu.m
|
841.50
|
56
|
13335
|
Cost of Granite Rough Stone Dry Packing for rivetment.
|
Cu.m
|
841.50
|
57
|
13345
|
Conveyance charges of sand including loading and unloading
|
Cu.m
|
0
|
58
|
13346
|
Conveyance charges of 40mm metal of HBG/OTG variety including loading and unloading
|
Cu.m
|
0
|
59
|
13347
|
Conveyance charges of 40mm metal of OTG variety including loading and unloading
|
Cu.m
|
0
|
60
|
13348
|
Conveyance charges of 20 mm metal of HBG/OTG variety including loading and unloading
|
Cu.m
|
0
|
61
|
13349
|
Conveyance charges of 20 mm metal of OTG variety including loading and unloading
|
Cu.m
|
0
|
62
|
13350
|
Conveyance charges of RR stone of HBG/OTG Variety including loading and unloading
|
Cu.m
|
0
|
63
|
13351
|
Conveyance charges of RR stone of OTG Variety including loading and unloading
|
Cu.m
|
0
|
64
|
13352
|
Conveyance charges of 225 mm rough stone of HBG/OTG variety including loading and unloading
|
Cu.m
|
0
|
65
|
13353
|
Conveyance charges of 225 mm rough stone of OTG variety including loading and unloading
|
Cu.m
|
0
|
66
|
13354
|
Cost of RR Masonry in OTG stone in cement mortar 1:5 for body wall, guide wall
|
Cu.m
|
2872.72
|
67
|
13355
|
Cost of OTG Rough Stone Dry Packing for loose apron.
|
Cu.m
|
841.50
|
68
|
13356
|
Cost of OTG Rough Stone Dry Packing for rivetment.
|
Cu.m
|
841.50
|
69
|
13357
|
Cost of Granite Rough Stone Dry Packing for toewall.
|
Cu.m
|
841.50
|
70
|
13358
|
Cost of OTG Rough Stone Dry Packing for toewall.
|
Cu.m
|
841.50
|
71
|
16652
|
Cost of CC(1:2.5:5) using 20mm HBG machine crushed metal including cost of all materials and labour charges and curing but excluding conveyance of all materials
|
Cu.m
|
4511.98
|
72
|
30798
|
Laying of cement concrete(1:5:10) using 40mm HBG/OTG machine crushed metal including cost of all materials and labour charges with machine mixing,but excluding conveyance of all materials etc,complete for foundation of checkdam
|
Cu.m
|
3671.32
|
73
|
30864
|
Name board and other contingencies
|
Nos.
|
500
|
74
|
30996
|
Cost of 225 mm thick rough stone for revetment/Apron/Toe Wall
|
Cu.m
|
841.50
|
75
|
31010
|
Cost of RR masonry in cement mortar 1:6 using new stones of hard variety including cost of all materials for body wall, guide wall,etc.
|
Cu.m
|
2872.72
|
76
|
31011
|
Cost of Plastering with cement mortar 1:5 mix 12mm thick including cost of all materials for body wall, guide walls, etc.
|
Sqm
|
255.08
|
77
|
Repairs to Existing Mini Percolation Tank
|
0313
|
Conveyance charges for 225 mm rough stone including loading and unloading
|
Trips
|
0
|
78
|
30825
|
Charges for rolling in layers by 2T roller/cattle treading including watering, necessary levelling and sectioning with keytrench
|
Cu.m
|
21.45
|
79
|
30826
|
Charges for rolling in layers by 10T roller/cattle treading including watering, necessary levelling and sectioning with keytrench
|
Cu.m
|
37.02
|
80
|
30864
|
Name board and other contingencies
|
Nos.
|
500
|
81
|
30990
|
Clearing of Light/medium/Juliflora including Up-rooting and removing of stumps
|
Sqm
|
6.06
|
82
|
30993
|
Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km
|
Cu.m
|
107.31
|
83
|
30994
|
Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund with Lead
|
Cu.m
|
55.35
|
84
|
30995
|
Conveyance charges for excavated earth from source to site for formation of Bund
|
Cu.m
|
0
|
85
|
30996
|
Cost of 225 mm thick rough stone for revetment/Apron/Toe Wall
|
Cu.m
|
841.50
|
86
|
30997
|
Earth work excavation with machine for stripping of loose soil
|
Cu.m
|
55.35
|
87
|
31000
|
Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km
|
Cu.m
|
107.31
|
88
|
31226
|
Cost of 225 mm thick rough stone for Apron/Toe Wall
|
Cu.m
|
841.50
|
89
|
31227
|
Cost of 225 mm thick rough stone for Revetment
|
Cu.m
|
841.50
|
90
|
31256
|
Rehandiling charges for formation of bund with available soils obtained from stripping,key trench and toe wall
|
Cu.m
|
27.68
|
91
|
Repairs to Existing Percolation Tank
|
0313
|
Conveyance charges for 225 mm rough stone including loading and unloading
|
Trips
|
0
|
92
|
0384
|
Conveyance Charges For Black Cotton Soil
|
Cu.m
|
0
|
93
|
13345
|
Conveyance charges of sand including loading and unloading
|
Cu.m
|
0
|
94
|
13346
|
Conveyance charges of 40mm metal of HBG/OTG variety including loading and unloading
|
Cu.m
|
0
|
95
|
13348
|
Conveyance charges of 20 mm metal of HBG/OTG variety including loading and unloading
|
Cu.m
|
0
|
96
|
13350
|
Conveyance charges of RR stone of HBG/OTG Variety including loading and unloading
|
Cu.m
|
0
|
97
|
13359
|
Cost of 225 mm thick Rough Stone for toe wall for Stone type OTG
|
Cu.m
|
841.50
|
98
|
30737
|
Laying of plain cement concrete (1:5:10) using 40mm HBG machine crushed metal including cost of all materials and labour charges with machine mixingand compaction, but excluding conveyance of all materials etc,complete for foundation of weir
|
Cu.m
|
3671.32
|
99
|
30738
|
Laying of plain cement concrete (1:3:6) using 60% of 40mm HBG machine crushed metall and 40% of 20mm HBG Machine crushed metal including cost of all materials and centering charges,vibrating charges and labour charges But excluding of conveyance of all materials etc,,complete for weir
|
Cu.m
|
4403.28
|
100
|
30739
|
Laying of plain cement concrete (1:2.5:5) using 20mm HBG machine crushed metal lincluding cost of all materials with machine mixing,compaction and labour charges,but excluding conveyance of all materials etc,complete for wearin coat
|
Cu.m
|
4511.98
|
101
|
30825
|
Charges for rolling in layers by 2T roller/cattle treading including watering, necessary levelling and sectioning with keytrench
|
Cu.m
|
21.45
|
102
|
30826
|
Charges for rolling in layers by 10T roller/cattle treading including watering, necessary levelling and sectioning with keytrench
|
Cu.m
|
37.02
|
103
|
30864
|
Name board and other contingencies
|
Nos.
|
500
|
104
|
30990
|
Clearing of Light/medium/Juliflora including Up-rooting and removing of stumps
|
Sqm
|
6.06
|
105
|
30991
|
Earth work excavation in all kinds of soils & placing the excavted soil using machine to the work site for formation of embankment to the required shape including hire charges for machinery and all other charges with a lead beyond 10m and upto 50m and lift up to 3 m for cutoff trench
|
Cu.m
|
66.50
|
106
|
30992
|
Earth work excavation and depositing on bank in all kinds of soils including boulders of bed and sides to required level,cost of all materials,machinary,labour,placing the excavated earth etc,complete with an initial lead upto 10m and lift upto 3m BC soil for cutoff trench
|
Cu.m
|
55.35
|
107
|
30993
|
Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km
|
Cu.m
|
107.31
|
108
|
30994
|
Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund with Lead
|
Cu.m
|
55.35
|
109
|
30995
|
Conveyance charges for excavated earth from source to site for formation of Bund
|
Cu.m
|
0
|
110
|
30996
|
Cost of 225 mm thick rough stone for revetment/Apron/Toe Wall
|
Cu.m
|
841.50
|
111
|
30997
|
Earth work excavation with machine for stripping of loose soil
|
Cu.m
|
55.35
|
112
|
31000
|
Earthwork Excavation and depositing on bank in all kinds of soils with Machinery for formation of Bund at site upto a lead beyond 50mts and upto 1 km
|
Cu.m
|
107.31
|
113
|
31001
|
Plastering with CM (1;5)mix,12 mm th including cost of all materials etc for 10 Sqm etc., complete
|
Sqm
|
255.08
|
114
|
31002
|
RR Masonry in CM (1;6) using new stones of hard variety including cost of all materials etc for 1Cum complete
|
Cum
|
2872.72
|