WDC-PMKSY 2.0

PROGRAMME:

The Department of Land Resources (DoLR), MoRD, GoI have sanctioned 35 projects for treatment of 1,46,686 ha., covering 248 Micro-WS/GPs in 21 districts of Telangana during the years 2021 to 2023.

I. Objectives:

Restoring the ecological balance by harnessing, conserving and developing
degraded natural resources.

Increased agricultural production & productivity through scientific approach
& sustainable agriculture practices.

Integrated livestock management for increasing incomes.

Livelihood security for the poorest of the rural poor.


II. Funding Pattern:

Centre: State in the ratio of 60:40.


III. Unit cost:

Rs.22,000/per ha., in Normal areas and Rs.28,000/- per ha., in Hilly & difficult areas.


iv. Project duration:

3 to 5 years from the year of the sanction of project.


V. Major Components:

Detailed Project Report (DPR)

Entry Point Activity (EPA)

Institution & Capacity Building (I&CB)

Natural Resource Management (NRM)

Production System Improvement (PSI) &

Livelihood (LH)


Component wise budget allocation:
Component

% of the Budget

- Administrative costs 10
- Monitoring & Evaluation (M&E) 2
Preparatory phase, including:
- Entry point activities 2
- Institution and capacity building, 3
- Detailed Project Report (DPR) 1
Watershed Works Phase:
- Natural Resource Management (NRM) 47
- Natural Resource Management & Governance (NRM& Governance) 2
-Livelihood for Asset less, Micro Enterprises & Business Development (ME&BD) 15
-Production System Improvement (PSI) 15
Consolidation phase 3
TOTAL 100
VI. Activities:

Development of water harvesting structures such as low-cost Farm ponds, Nalla bunds, Check Dams, Percolation tanks and Ground water recharge measures to conserve and allow percolation of water.

Desilting of village tanks for drinking / Irrigation / Fisheries development.

Afforestation including block plantations, Agro-forestry and Horticulture development, Pasture development etc.

Land development including in-situ soil and moisture conservation measures like contour and graded bunds, nursery raising for fodder, timber, fuel wood, horticulture and non-timber forest product species.

Drainage line treatment with a combination of vegetative and engineering structures.

Crop demonstrations for popularizing new crops / varieties.

Repair, restoration and up-gradation of existing common property assets and structures in the watershed to obtain optimum and sustained benefits from previous public investments.

Promotion and propagation of non-conventional energy saving devices, energy conservation measures, Bio-fuel plantations.


VII. Approach in implementation:

Project based, Project will be different phases of implementation at a given time as per their sanction, asset based and targets are project based and multi disciplinary actions.


VIII. Phases of implementation:
Phase Year(s) Activities under implementation
1.Preparatory Phase up to 1 DPR, EPA, I&CB
2.Work Phase 2-3 NRM, PSI, LH, I&CB
3.Consolidation & Withdrawal Phase up to 1 Consolidation, M&E, I&CB
District wise sanctioned projects under WDC-PMKSY 2.0 are:
S. No District name No. of Projects No. of MWS/GPs Sanctioned area (ha.) Project cost (Cr.)
1 Adilabad 2 15 9835 27.54
2 B Kothagudem 4 15 16695 46.75
3 Jangaon 1 13 4992 10.98
4 JS Bhupalapally 3 21 12513 35.04
5 K B Asifabad 4 23 13252 37.11
6 Khammam 1 11 4974 13.93
7 Mahabubnagar 2 14 8209 18.06
8 Mancherial 2 11 9943 27.84
9 Medak 1 8 3459 7.61
10 Nagarkurnool 1 3 2548 5.61
11 Nalgonda 1 6 4971 10.94
12 Nirmal 2 21 8389 23.49
13 Nizamabad 2 24 8910 19.60
14 Rajanna Sircilla 2 15 5960 13.11
15 Rangareddi 1 5 4346 9.56
16 Sangareddy 1 8 4733 10.41
17 Siddipet 1 4 4803 10.57
18 Suryapet 1 7 4253 9.36
19 Vikarabad 1 7 4998 11.00
20 Warangal 1 9 4618 10.16
21 Y Bhuvanagiri 1 8 4285 9.43
Total 35 248 146686 368.07